Zorita Nuclear Power Plant
A Benchmark Project in Industrial Maintenance
![Zorita_FULL2](https://catarigroup.com/app/uploads/2025/01/Zorita_FULL2.png)
The company Maym Andamios, with over 20 years of experience, completed the scaffolding installation on a 400kV high-voltage tower. To ensure the safety and efficiency of this work, the Catari US® system was used— a multidirectional scaffolding solution recognized for its reliability and quality in demanding industrial environments.
The Catari US® system was the key to the success of this installation. Its design allows exceptional adaptability to complex structures, such as the high-voltage tower at the Zorita Nuclear Power Plant. This system stands out for its stability, strength, and easy assembly, optimizing execution times without compromising worker safety.
Its design cmeets with the highest international safety standards, which is essential in highly demanding environments like a nuclear power plant. Additionally, the secure assembly system minimizes risks, always ensuring worker protection.
![Zorita_Mosaic1.1](https://catarigroup.com/app/uploads/2025/01/Zorita_Mosaic1.1.png)
![Zorita_Mosaic2](https://catarigroup.com/app/uploads/2025/01/Zorita_Mosaic2.png)
![https://catarigroup.com/app/uploads/2025/01/Zorita_Mosaic3.png](https://catarigroup.com/app/uploads/2025/01/Zorita_Mosaic3.png)
![Zorita_Mosaic3](https://catarigroup.com/app/uploads/2025/01/Zorita_Mosaic3.png)
One of the most notable aspects of this project was that the work was carried out during nighttime hours. This presented both a logistical and operational challenge, requiring precise planning and a highly skilled team to ensure the installation was completed smoothly and without incidents. With its vast experience in highly complex industrial environments, Maym Andamios once again demonstrated its ability to meet such challenges with professionalism and efficiency.
This project at the Zorita’s Nuclear Power Plant is yet another evidence of Maym Andamios and Catari’s commitment to excellence in industrial maintenance. The combination of an experienced team and the use of innovative solutions like Catari US® enabled the successful completion of a safe and efficient installation, meeting all industry regulations and requirements.